MURALIM PSC

Awarded on 3 December 2010 (30 Years Contract)

Contractor :
Dart Energy (Muralim) Pte Ltd (1) 100% (Operator)
Current Acreage: 687.9 km2
Resources: (2)
  • Gas In Place
1,436 BCF
  • Prospective
682 BCF
Exploration Data:
  • CBM Wells (drilled by NuEnergy Gas)
6 wells
  • Seismic lines
23 lines
  • Conventional oil and gas wells
50 wells
Strategic Location:
  • Located about 70 km and 140 km from growing economy and industrial cities of Prabumulih and Palembang respectively
  • Co-located Tanjung Enim PSC CBM operated by NuEnergy Gas providing opportunity for integrated development
  • Well developed infrastructure with long establishment of Medco Oil and Gas Facilities
  • About 65 km from major gas trunk lines to Java market and export to Malaysia and Singapore
Current Status:
  • NuEnergy continues to undertake the dewatering activities to collect gas production data. Gas flaring tests showed flow rate.
  • A gas discovery report was submitted to SKK Migas in May 2025 and subsequently followed up by SKK Migas’s site visit to verify the dewatering activity and gas flaring results.
  • Applied for a 12-month extension to complete the preparations of a POD proposal.

Notes:

(1) Subsidiary of NuEnergy Gas Limited
(2) The resources estimates were certified by Netherland Sewell & Associates Inc, November 2012 and reported at net of NuEnergy Gas working interest. Gas in place estimate was reported at gross.